{"id":4101,"date":"2015-10-02T12:28:14","date_gmt":"2015-10-02T11:28:14","guid":{"rendered":"http:\/\/blogs.scotland.gov.uk\/coastal-monitoring\/?p=4101"},"modified":"2018-04-11T11:29:26","modified_gmt":"2018-04-11T10:29:26","slug":"mrv-alba-na-mara-survey-1515a-programme","status":"publish","type":"post","link":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/","title":{"rendered":"MRV Alba na Mara: Survey 1515A Programme"},"content":{"rendered":"<div>\n<p>\u00a0<strong>Duration:<\/strong> 3-22 October 2015<\/p>\n<p><strong>Gear:<\/strong><\/p>\n<ul>\n<li>Pyramid frame + calibration mesh<\/li>\n<li>Large camera drop frame<\/li>\n<li>Large bongos + flow meters + plankton kit<\/li>\n<li>Day grab table<\/li>\n<li>HD TV system + Lights<\/li>\n<li>Armoured cable + spare + axle stands<\/li>\n<li>Stereo TV System<\/li>\n<\/ul>\n<p><strong>Background:<\/strong><\/p>\n<p>1515A will survey the waters around the Small Isles Marine Protected Area (MPA). It is the primary objective to survey monitoring sites previously surveyed in 2012, 2013 and 2014 that support Scotland\u2019s Priority Marine Features (PMFs). 1515A will extend survey activities to possible control areas outside the MPA. Work from these surveys will be used to determine the effect of MPAs established in Scottish waters. A secondary objective will be to survey additional control sites in the area surrounding the Small Isles that provide suitable substrate for the tall sea pen, <em>Funiculina quadrangularis<\/em>. Data from both work streams will contribute to a potential impact (BACI) study once protective measures within the MPA are introduced. Potential surveys boxes are shown in Figure 1. Plankton tows within the Sound of Canna will also be conducted, targeting the larvae of the fan mussel,\u00a0\u00a0<em>Atrina fragilis <\/em>(Figure 2)<em>.<\/em><\/p>\n<p><strong>Objectives:<\/strong><\/p>\n<ol>\n<li>To survey known populations of priority marine feature (PMF) species within and outside the Small Isles MPA.<\/li>\n<li>To conduct further assessments of <em>Funiculina quadrangularis <\/em>abundance within the Smalls Isles MPA and areas outside.<\/li>\n<li>To assess the extent and density of <em>Atrina fragilis<\/em> aggregations within the Sound of Canna.<\/li>\n<li>To conduct larval tows using the large dual bongo net within the Sound of Canna and nearby waters.<\/li>\n<li>To survey areas outside the Sound of Canna that may provide suitable habitat for further <em>Atrina fragilis <\/em>aggregations<em>.<\/em><\/li>\n<li>If time\/weather allows, to conduct exploratory surveys in areas outside the SMI MPA that may provide suitable controls for hard substrate PMF aggregations (i.e. <em>Leptometra celtica<\/em>, <em>Parazoanthus anguicomis<\/em> and <em>Swiftia pallida.<\/em><\/li>\n<\/ol>\n<p><strong>Benthic survey:<\/strong><\/p>\n<p>UW TV surveys of the seabed at various sites inside and outside the Small Isles MPA will be carried out during 1515A. The survey will utilise the HD drop camera system (using the large drop frame and, later, the pyramid frame) deployed from the aft of the vessel. Species type, species densities and substrate type (assessed visually) will be classified for each video transect post-survey. RoxAnn sediment data will also be collected at each site.<\/p>\n<p><strong>Larval dispersal:<\/strong><\/p>\n<p>1515A will sample plankton from the water around Canna (Figure 2). This programme of work will target the larvae of the fan mussel, <em>Atrina fragilis<\/em>, and follows on from plankton surveys conducted in June 2012 (survey 1012A), September 2013 (1213A) and September 2014 (1714A). Sampling will be conducted using the large (1 m diameter) dual bongo net. Dual samples will be stored separately in isopropanol and ethanol.<\/p>\n<\/div>\n<p><strong>Figure 1:<\/strong> The Small Isles MPA with proposed survey boxes marked (For objectives 1,2,3,5,6).<\/p>\n<p><strong><a href=\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1a.jpg\"><img decoding=\"async\" class=\"wp-image-4102 alignleft lazyload\" data-src=\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1a-1024x723.jpg\" alt=\"1515A Small Isles MPAs Figure 1a\" width=\"391\" height=\"275\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 391px; --smush-placeholder-aspect-ratio: 391\/275;\" \/><\/a><\/strong><br \/>\n<a href=\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1b.jpg\"><img decoding=\"async\" class=\"wp-image-4103 alignleft lazyload\" data-src=\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1b-1024x723.jpg\" alt=\"1515A Small Isles MPAs Figure 1b\" width=\"395\" height=\"278\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 395px; --smush-placeholder-aspect-ratio: 395\/278;\" \/><\/a><br \/>\n<strong><a href=\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1c.jpg\"><img decoding=\"async\" class=\"wp-image-4104 alignleft lazyload\" data-src=\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1c-1024x723.jpg\" alt=\"1515A Small Isles MPAs Figure 1c\" width=\"397\" height=\"280\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 397px; --smush-placeholder-aspect-ratio: 397\/280;\" \/><\/a><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: left;\"><strong>Figure 2: <\/strong>Potential plankton tows for <em>Atrina fagilis<\/em> larvae (Objective 4).<\/p>\n<p><a href=\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Potential-Plankton-tows-Figure-2a.jpg\"><img decoding=\"async\" class=\"alignleft wp-image-4105 lazyload\" data-src=\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Potential-Plankton-tows-Figure-2a-1024x724.jpg\" alt=\"1515A Potential Plankton tows Figure 2a\" width=\"397\" height=\"280\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 397px; --smush-placeholder-aspect-ratio: 397\/280;\" \/><\/a><a href=\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Potential-Plankton-tows-Figure-2b.jpg\"><img decoding=\"async\" class=\"alignleft wp-image-4106 lazyload\" data-src=\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Potential-Plankton-tows-Figure-2b-1024x724.jpg\" alt=\"1515A Potential Plankton tows Figure 2b\" width=\"397\" height=\"280\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 397px; --smush-placeholder-aspect-ratio: 397\/280;\" \/><\/a><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0Duration: 3-22 October 2015 Gear: Pyramid frame + calibration mesh Large camera drop frame Large bongos + flow meters + plankton kit Day grab table HD TV system + Lights Armoured cable + spare + axle stands Stereo TV System Background: 1515A will survey the waters around the Small Isles Marine Protected Area (MPA). It&#8230;<\/p>\n","protected":false},"author":118,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13,14,15,20],"tags":[],"class_list":["post-4101","post","type-post","status-publish","format-standard","hentry","category-msc","category-general","category-mss","category-research-vessel-surveys"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>MRV Alba na Mara: Survey 1515A Programme - Marine<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MRV Alba na Mara: Survey 1515A Programme - Marine\" \/>\n<meta property=\"og:description\" content=\"\u00a0Duration: 3-22 October 2015 Gear: Pyramid frame + calibration mesh Large camera drop frame Large bongos + flow meters + plankton kit Day grab table HD TV system + Lights Armoured cable + spare + axle stands Stereo TV System Background: 1515A will survey the waters around the Small Isles Marine Protected Area (MPA). It...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/\" \/>\n<meta property=\"og:site_name\" content=\"Marine\" \/>\n<meta property=\"article:published_time\" content=\"2015-10-02T11:28:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-04-11T10:29:26+00:00\" \/>\n<meta name=\"author\" content=\"Marine Directorate Communications\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Marine Directorate Communications\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/\"},\"author\":{\"name\":\"Marine Directorate Communications\",\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/#\/schema\/person\/3e5abb68fa165c0be2defdb04924af0a\"},\"headline\":\"MRV Alba na Mara: Survey 1515A Programme\",\"datePublished\":\"2015-10-02T11:28:14+00:00\",\"dateModified\":\"2018-04-11T10:29:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/\"},\"wordCount\":476,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1a-1024x723.jpg\",\"articleSection\":[\"Compliance\",\"Marine Directorate general\",\"Marine Directorate Science\",\"Research Vessel Surveys\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/\",\"url\":\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/\",\"name\":\"MRV Alba na Mara: Survey 1515A Programme - Marine\",\"isPartOf\":{\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1a-1024x723.jpg\",\"datePublished\":\"2015-10-02T11:28:14+00:00\",\"dateModified\":\"2018-04-11T10:29:26+00:00\",\"author\":{\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/#\/schema\/person\/3e5abb68fa165c0be2defdb04924af0a\"},\"breadcrumb\":{\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#primaryimage\",\"url\":\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1a-1024x723.jpg\",\"contentUrl\":\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1a-1024x723.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/blogs.gov.scot\/marine-scotland\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MRV Alba na Mara: Survey 1515A Programme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/#website\",\"url\":\"https:\/\/blogs.gov.scot\/marine-scotland\/\",\"name\":\"Marine\",\"description\":\"Scottish Government Blog\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/blogs.gov.scot\/marine-scotland\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/#\/schema\/person\/3e5abb68fa165c0be2defdb04924af0a\",\"name\":\"Marine Directorate Communications\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/blogs.gov.scot\/marine-scotland\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/wphb-cache\/gravatar\/923\/923709b122ec3d09120a4b45b3a3e6dcx96.jpg\",\"contentUrl\":\"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/wphb-cache\/gravatar\/923\/923709b122ec3d09120a4b45b3a3e6dcx96.jpg\",\"caption\":\"Marine Directorate Communications\"},\"url\":\"https:\/\/blogs.gov.scot\/marine-scotland\/author\/lyndsaycruickshank\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"MRV Alba na Mara: Survey 1515A Programme - Marine","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/","og_locale":"en_GB","og_type":"article","og_title":"MRV Alba na Mara: Survey 1515A Programme - Marine","og_description":"\u00a0Duration: 3-22 October 2015 Gear: Pyramid frame + calibration mesh Large camera drop frame Large bongos + flow meters + plankton kit Day grab table HD TV system + Lights Armoured cable + spare + axle stands Stereo TV System Background: 1515A will survey the waters around the Small Isles Marine Protected Area (MPA). It...","og_url":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/","og_site_name":"Marine","article_published_time":"2015-10-02T11:28:14+00:00","article_modified_time":"2018-04-11T10:29:26+00:00","author":"Marine Directorate Communications","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Marine Directorate Communications","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#article","isPartOf":{"@id":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/"},"author":{"name":"Marine Directorate Communications","@id":"https:\/\/blogs.gov.scot\/marine-scotland\/#\/schema\/person\/3e5abb68fa165c0be2defdb04924af0a"},"headline":"MRV Alba na Mara: Survey 1515A Programme","datePublished":"2015-10-02T11:28:14+00:00","dateModified":"2018-04-11T10:29:26+00:00","mainEntityOfPage":{"@id":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/"},"wordCount":476,"commentCount":0,"image":{"@id":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1a-1024x723.jpg","articleSection":["Compliance","Marine Directorate general","Marine Directorate Science","Research Vessel Surveys"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/","url":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/","name":"MRV Alba na Mara: Survey 1515A Programme - Marine","isPartOf":{"@id":"https:\/\/blogs.gov.scot\/marine-scotland\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#primaryimage"},"image":{"@id":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1a-1024x723.jpg","datePublished":"2015-10-02T11:28:14+00:00","dateModified":"2018-04-11T10:29:26+00:00","author":{"@id":"https:\/\/blogs.gov.scot\/marine-scotland\/#\/schema\/person\/3e5abb68fa165c0be2defdb04924af0a"},"breadcrumb":{"@id":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#primaryimage","url":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1a-1024x723.jpg","contentUrl":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/uploads\/sites\/23\/2015\/09\/1515A-Small-Isles-MPAs-Figure-1a-1024x723.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/blogs.gov.scot\/marine-scotland\/2015\/10\/02\/mrv-alba-na-mara-survey-1515a-programme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogs.gov.scot\/marine-scotland\/"},{"@type":"ListItem","position":2,"name":"MRV Alba na Mara: Survey 1515A Programme"}]},{"@type":"WebSite","@id":"https:\/\/blogs.gov.scot\/marine-scotland\/#website","url":"https:\/\/blogs.gov.scot\/marine-scotland\/","name":"Marine","description":"Scottish Government Blog","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogs.gov.scot\/marine-scotland\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/blogs.gov.scot\/marine-scotland\/#\/schema\/person\/3e5abb68fa165c0be2defdb04924af0a","name":"Marine Directorate Communications","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/blogs.gov.scot\/marine-scotland\/#\/schema\/person\/image\/","url":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/wphb-cache\/gravatar\/923\/923709b122ec3d09120a4b45b3a3e6dcx96.jpg","contentUrl":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-content\/wphb-cache\/gravatar\/923\/923709b122ec3d09120a4b45b3a3e6dcx96.jpg","caption":"Marine Directorate Communications"},"url":"https:\/\/blogs.gov.scot\/marine-scotland\/author\/lyndsaycruickshank\/"}]}},"_links":{"self":[{"href":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-json\/wp\/v2\/posts\/4101","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-json\/wp\/v2\/users\/118"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-json\/wp\/v2\/comments?post=4101"}],"version-history":[{"count":0,"href":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-json\/wp\/v2\/posts\/4101\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-json\/wp\/v2\/media?parent=4101"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-json\/wp\/v2\/categories?post=4101"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.gov.scot\/marine-scotland\/wp-json\/wp\/v2\/tags?post=4101"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}