Marine

  • Hydrographic Sampling in the Northern North Sea

    15th October 2019 by

    MRV Scotia Survey: 1519S Programme Duration: 14-24 October 2019 Gear: Sea-Bird Conductivity Temperature Depth units (CTDs), RBR CTD, Acoustic Doppler Current Profilers (ADCPs) and current meter instrumentation, water filtering equipment, mooring equipment, chemistry sampling equipment. Objectives: Test the SBE911 and CTD carousel (main CTD crane) and the SBE25 and Aquatracker (using plankton crane) in the Buchan…

    Read more

  • Clicking with Marine Mammals

    31st July 2019 by

    MRV Alba na Mara Survey: 1219A Duration: 25 July – 05 August 2019 Objectives: Retrieve and deploy a series of acoustic release systems (22 subsurface moorings) with attached acoustic recording devices (22 C-POD, 7 sound recorder) as part of the ECOMMAS (East Coast Marine Mammal Acoustic Study), JOMOPANS (Joint Monitoring Programme for Ambient Noise North…

    Read more

  • Hydrographic Sampling with Scotia

    19th April 2019 by

    MRV Scotia Programme Survey: 0519S Duration: 16-24 April 2019 Gear: Sea-Bird Conductivity/Temperature/Depth (CTD) unit; Autonomous Underwater Vehicle (AUV); PIES mooring; Acoustic Doppler Current Profilers (ADCPs); Current meter instrumentation; Water filtering equipment; Mooring equipment; and Chemistry sampling equipment. Procedure On sailing from Aberdeen MRV Scotia will make passage to the start (western end) of the AlterEco…

    Read more

  • Water Sampling for Long-Term Monitoring

    15th October 2018 by

    Survey: MRV Scotia 1418S Duration: 5-15 October 2018 Procedure: Scotia will make her way to the eastern start of the Nolso – Flugga (NOL) section and start collecting long term monitoring samples and taking CTD profiles. On a previous trip – the 0618S survey – a mooring in an AL500 frame also failed to surface…

    Read more

  • Let’s Go Fly a Kite

    17th September 2018 by

    Survey: 1418A MRV Alba na Mara Programme This survey will be executed in two parts during the window of 12th September to the 25th September 2018. Part One Objectives: Live fish capture for tank based trials in our Fish Behaviour Unit (FBU); and Trialing new Vonin ‘Flyer’ headline kites. Part Two Objectives: Recover (VR2Tx) salmon…

    Read more

  • Location, Location, Location

    13th August 2018 by

    Survey: 1218A MRV Alba na Mara Duration: 13-22 August 2018 Gear: Subsurface Passive Acoustic Monitoring (PAM) Moorings Objectives: To retrieve and deploy a series of acoustic release systems (19 subsurface moorings) with attached acoustic recording devices (19 C-POD, 6 SM2M and 1 sound recorder) as part of the east coast marine mammal monitoring programme and…

    Read more

  • Recover, Download, Re-deploy, Repeat

    4th May 2018 by

    Survey: 0618S – MRV Scotia Duration: 2-12 May 2018 Gear: Sea-Bird CTDs, ADCPs and current meter instrumentation, water filtering equipment, mooring equipment, chemistry sampling and analysis equipment. Objectives: Perform hydrographic sampling along the AlterEco monitoring section in the northern North Sea, which will be sampled on all MSS oceanographic surveys in 2018. Perform hydrographic sampling…

    Read more